Installation process

Installation process

What actually happens on the day.

Timings assume a typical home with existing Wi-Fi; larger sites are split and agreed in advance.

01

Arrival and protection

Floors and surfaces covered, route confirmed, devices unpacked and checked against the scope.

08:30

02

Mounting

Positions marked, fixings chosen per substrate, cable entries drilled and sealed.

09:00

03

Wiring and power

Low-voltage runs and power connections made and tested before any device is energised.

10:30

04

Configuration

Devices onboarded, recorder and storage set, motion zones drawn, notifications configured.

13:00

05

Testing

Live view, playback, alerts and restart recovery checked with you present.

15:00

06

Handover

App walkthrough, account handover, documentation left on site, site cleared.

15:30

What can change the plan

Stated up front so nothing is a surprise.

01

Cable route longer than expected

Additional cable and containment, quoted before continuing.

02

Unsound mounting surface

Render or cladding that will not hold a fixing — alternative bracket or position, quoted.

03

No power at the position

Extra circuit or an alternative device position, agreed with you first.