ECO POWER GROUP

How it works

How it works

Four steps from first message to a system you can operate.

No account needed to ask a question, and no obligation after the survey.

01

1 · Tell us the basics

Property type, what you want covered, and whether equipment is already bought.

02

2 · Survey

On site or remote. We confirm positions, power, network and storage, then send a written scope.

03

3 · Install

Mounting, wiring and configuration in one visit for most homes; larger sites split across days.

04

4 · Handover

Every channel tested with you present, app walkthrough, documentation left on site.

What you get in writing

Before and after the work.

01

Scope and quote

Device count, positions, cabling approach and a fixed price.

Before

02

Change handling

If site conditions differ, we stop and quote the difference before continuing.

During

03

Handover sheet

Device locations, account details, retention settings and what was tested.

After

Start with a survey

Most projects begin with a short call and a few photos.