Four steps from first message to a system you can operate.
No account needed to ask a question, and no obligation after the survey.
1 · Tell us the basics
Property type, what you want covered, and whether equipment is already bought.
2 · Survey
On site or remote. We confirm positions, power, network and storage, then send a written scope.
3 · Install
Mounting, wiring and configuration in one visit for most homes; larger sites split across days.
4 · Handover
Every channel tested with you present, app walkthrough, documentation left on site.
Before and after the work.
Scope and quote
Device count, positions, cabling approach and a fixed price.
Before
Change handling
If site conditions differ, we stop and quote the difference before continuing.
During
Handover sheet
Device locations, account details, retention settings and what was tested.
After